Construction Linked Payment Plan
|
Booking Amount
|
As Applicable
|
Within 30 Days
|
20% Less Booking Amount
|
|
BALANCE
PAYMENT
|
|
|
Commencement of Foundation
|
10%
|
|
|
Completion of Ground Floor Slab
|
10%
|
Completion of 2nd Floor Slab
|
10%
|
Completion of 4th Floor Slab
|
10%
|
Completion of 6th Floor Slab
|
10%
|
Completion of 8th Floor Slab
|
7.50%
|
Completion of 10th Floor Slab
|
5%
|
Completion of 12th Roof
|
5%
|
Commencement of Block Work
|
5%
|
Commencement of Flooring
|
5%
|
Possession
|
2.50%
|
Total
|
100%
|
|
|
|
|
Flexi (5% Rebate on CLP Rates)
|
At the time of booking
|
10%
|
Within 60 days of Booking
|
40%
|
|
On completion of foundation
|
9%
|
|
On casting of basement slab
|
9%
|
|
|
On casting of second floor slab
|
9%
|
On casting of fifth floor slab
|
9%
|
On casting of eighth floor slab
|
9%
|
On offer of Possession
|
5%
|
|
|
|
|
Down Payment Plan (10% Rebate on CLP Rates)
|
At the time of Booking
|
10%
|
Within 30 days of Booking
|
85%
|
|
On offer of Possession
|
5%
|
|
Booking Amount
|
2 BHK
|
Rs. 2,50,000/-
|
3 BHK + 2T
|
Rs. 3,50,000/-
|
3BHK + 3T
|
RS. 4,50,000/-
|
Terms
and Conditions:
1) Price List as on date of booking shall be applicable.
2) PLC if any shall be charged alongwith installments towards
basic cost.
3) Cheques/Bank Drafts to be issued in favor of 'Supertech
Limited ' payable at Bangalore.
4) Stamp Duty, Registration Charges, Maintenance, Sinking fund
& Legal Fee will Payable at the time of possession.
5) Service tax, VAT & other government levies are extra, as
applicable.
6) The terms and condition of sale stated herein are indicative
and are subject to detailed terms and conditions in the 'Agreement to Sell'/
'Flat Buyer's Agreement' and are subject to change at sole discretion of the
company.
7) All building plans, layouts, specifications are subject to
changes and modifications as decided by the company, architect or any other
competent authority.
8) Timely payments of the installments is the essence of the
Booking.
9) This Price List supercedes all previous price lists.
Structure:
|
Foundation:
|
Appropriately designed to suit the
bearing capacity of the soil Super Structure- RCC framed structurePercentage
|
Cement:
|
43/53 grade cement of reputed
brand like Birla/ Grasim or equivalent.10%
|
|
Steel:
|
High yield stress deformed bar
(415N/mm2)15%
|
|
No. of Floors:
|
Basement, Ground + 13 Upper floors
(as per the designed concept of the architect)
|
|
|
Floor Slab:
|
Regular beam type of construction
adequately designed.
|
|
|
|
|
Walls:
|
Walls:
|
200/150/100 mm Walls
|
Flooring:
|
Common Area:
|
Combination of Vitrified &
Granite Living/Dining: 600*600mm Vitrified tiles
|
Bedrooms:
|
Laminated Wooden Flooring in all
Bedrooms
|
|
Kitchen:
|
Vitrified Flooring, Ceramic Tile
Dado up to 2 ft above counter
|
|
Toilet:
|
Anti-skid Ceramic Flooring/Ceramic
Dado up to 7 ft
|
|
|
Balcony:
|
Anti-skid Ceramic Flooring
|
|
|
|
|
Doors & Windows:
|
Main Doors :
|
Teak-Wood Frame with Solid Teak
Veneered Shutter (Polished)
|
Other Doors:
|
Hard-Wood Frame with Masonite
Flush Shutter (Polished)
|
|
Windows:
|
Aluminum Powder Coated
|
|
Sanitary & Fixtures:
|
Sanitary & Fixtures:
|
Reputed Make Sanitary (Flush Valve
System for Water Closets)
|
Wash Basins:
|
Granite Counter Top Wash Basins
|
|
Fixtures:
|
CP Fixtures (Jaquar/Equivalent)
|
|
Painting:
|
Lobby/Staircase:
|
Plastic Emulsion
|
Internal Walls:
|
Plastic Emulsion
|
|
External Walls:
|
Texture Finish
|
|
Electrical & Communication:
|
Electrical & Communication:
|
Main Distribution Board for each
flat with area-wise MCB
|
Cabling & Wiring:
|
Concealed PVC Conduits with Copper
Wiring Geyser Points in all toilets
|
|
Switches:
|
Modular Switches
|
|
TV & Telephone Points:
|
Cable TV with Cabling, Points in
Living & Master Bedroom A/C Conduit Provision in Living/Dining &
Bedrooms
|
|
Generator:
|
100 % DG Back Up for Common
Services, 1.0KW back up for each flat
|
|
Water Supply System:
|
Water Supply System:
|
PVC Soil Pipe & CPVC Water
Supply
|